She is 2.8m long, 710mm wide and 1.27m high. Weight? Probably between 750 and 900kg.
Our railway has quite steep gradients - about 1 in 100 uphill for 200m - and we run trains of one luggage car plus 4 passenger cars. Normally, about 20 people but sometimes more. But this loco will haul much more ...
Die Suche ergab 21 Treffer
- So 8. Nov 2015, 23:35
- Forum: Dampf & Diesel
- Thema: Single fairlie in 7.25" gauge
- Antworten: 4
- Zugriffe: 6857
- Sa 7. Nov 2015, 22:38
- Forum: Dampf & Diesel
- Thema: Single fairlie in 7.25" gauge
- Antworten: 4
- Zugriffe: 6857
Re: Single fairlie in 7.25" gauge
Swanley Park, Kent - about 15 miles South East of London
- Sa 7. Nov 2015, 11:05
- Forum: Dampf & Diesel
- Thema: Single fairlie in 7.25" gauge
- Antworten: 4
- Zugriffe: 6857
Single fairlie in 7.25" gauge
It's been a while since I posted here, but I have been building a locomotive that I think you might be interested in. She has taken 3 years to build, and was inspired by 'Taliesin' of the Ffestiniog Railway.
https://www.buntbahn.de/fotos/data/500/5053side.jpg
https://www.buntbahn.de/fotos/data ...
https://www.buntbahn.de/fotos/data/500/5053side.jpg
https://www.buntbahn.de/fotos/data ...
- Fr 13. Apr 2012, 09:49
- Forum: Dampf & Diesel
- Thema: Building report: O&K in 184mm gauge.
- Antworten: 22
- Zugriffe: 29634
Re: Building report: O&K in 184mm gauge.
Finally, on 1st April, the two tinkerbells ran together.


Today is a sad day for me - the twin with the roof leaves for her new home, so this may be the last time they are seen together.


Today is a sad day for me - the twin with the roof leaves for her new home, so this may be the last time they are seen together.
- Fr 24. Feb 2012, 23:17
- Forum: Dampf & Diesel
- Thema: Building report: O&K in 184mm gauge.
- Antworten: 22
- Zugriffe: 29634
Re: Building report: O&K in 184mm gauge.
All,
Today I (almost) completed the first of the tinkerbells:

Now my attention turns to completing the second one - the lining needs to be applied to the tanks and bunker, and some pipework remains to be done. Then I can steam tst them both.
Today I (almost) completed the first of the tinkerbells:

Now my attention turns to completing the second one - the lining needs to be applied to the tanks and bunker, and some pipework remains to be done. Then I can steam tst them both.
- So 11. Dez 2011, 18:52
- Forum: Dampf & Diesel
- Thema: Building report: O&K in 184mm gauge.
- Antworten: 22
- Zugriffe: 29634
Re: Building report: O&K in 184mm gauge.
Martin,
I'm not sure why the pictures do not show any more - they are still there in reality, just do not show. I will see if I can find out why.
The tinkerbells - they are coming on very well. I will post some photographs as soon as the weather is good enough to get them out. I hope to get the ...
I'm not sure why the pictures do not show any more - they are still there in reality, just do not show. I will see if I can find out why.
The tinkerbells - they are coming on very well. I will post some photographs as soon as the weather is good enough to get them out. I hope to get the ...
- Fr 11. Nov 2011, 09:35
- Forum: Dampf & Diesel
- Thema: Building report: O&K in 184mm gauge.
- Antworten: 22
- Zugriffe: 29634
Re: Building report: O&K in 184mm gauge.
Martin,
Just to update you on the tinkerbells: The boilers are on and the tanks and bunkers are now made. Very shortly, I will take these parts to be painted, and then final assembly, piping up, etc. ready for steam trials can be done. I expect to have them in steam early in 2012.
Regards
Peter
Just to update you on the tinkerbells: The boilers are on and the tanks and bunkers are now made. Very shortly, I will take these parts to be painted, and then final assembly, piping up, etc. ready for steam trials can be done. I expect to have them in steam early in 2012.
Regards
Peter
- Di 10. Mai 2011, 16:25
- Forum: Allgemeines
- Thema: "Private" Feldbahn (Modellbau) 12,25" in 1:12
- Antworten: 11
- Zugriffe: 56763
Re: "Private" Feldbahn (Modellbau) 12,25" in
Gerald,
I think you know from the Gnatterbox, but the two O&K's are now both running and with their new owners. If you're ever in the UK in London, let me know and I can tell you where you can go and see one of them - both are just a short train ride from the capital.
Peter
I think you know from the Gnatterbox, but the two O&K's are now both running and with their new owners. If you're ever in the UK in London, let me know and I can tell you where you can go and see one of them - both are just a short train ride from the capital.
Peter
- Sa 2. Apr 2011, 22:03
- Forum: Dampf & Diesel
- Thema: Building report: O&K in 184mm gauge.
- Antworten: 22
- Zugriffe: 29634
Re: Building report: O&K in 184mm gauge.
Martin,
I have recently completed the smokeboxes for the tinkerbells. This includes the doors, hinges etc. So I'm now pretty close to putting the boilers on.
Peter
I have recently completed the smokeboxes for the tinkerbells. This includes the doors, hinges etc. So I'm now pretty close to putting the boilers on.
Peter
- Sa 2. Apr 2011, 18:11
- Forum: Dampf & Diesel
- Thema: Building report: O&K in 184mm gauge.
- Antworten: 22
- Zugriffe: 29634
Re: Building report: O&K in 184mm gauge.
Today the owner of the blue O&K held a party to name her.

The photo above shows him bringing a 3 coach train upthe 1 in 100 from the car park station to the main station at our railway. I think the smile on his face says it all!!

The photo above shows him bringing a 3 coach train upthe 1 in 100 from the car park station to the main station at our railway. I think the smile on his face says it all!!